[TML] [Merchant Shipping] Some ideas I came up with to make merchant shipping more interesing
Timothy Little
tim at little-possums.net
Tue Apr 15 17:03:31 MDT 2008
On Tue, Apr 15, 2008 at 09:05:52AM -0400, Tom B wrote:
> In heavy urbanization, you may have a *lot* of larger plants. So the
> runs might not be that long to any particular place you'd need to
> power.
Err, what do you mean by "larger plants"? The typical sizes of plants
I'm assuming are on the order of a hundred MW or so, probably about
the size of a small apartment, and costing on the order of 1-2 MCr.
Actually very close in many ways to the suburban telephone exchanges
here.
Sure there may be links to other reactors in nearby areas for
redundancy and load-balancing, but I don't see any reason at all for
any longer-range links.
I'm not talking about microgeneration with each house having its own
plant. Although, a large office building or apartment complex
possibly would. A large industrial complex certainly would.
- Tim
More information about the TML
mailing list